Background

8 months overall construction schedule based on a $2M project value.

Project

The Rose Hill Plaza project was a redevelopment of a former gas station site, and ran simultaneously alongside the Gateway project. This building was specifically designed for a bank, with specialized communications and security requirements. The Class A facility was constructed of conventional steel structure and framing.

Result

In this project, the Redhawk team was able to map effectively to budget and site constraints.