Seattle, WA

Background

Phase 1 (Floors 2 through 5) - 4 months overall construction schedule based on a $1.9 mm project value
Phase 2 (1st Floor) - 4 months overall construction schedule based on a $705k project value

Project

This was a phased project. The employees occupied the first floor while floors 2 through 5 were under construction, then the employees moved upstairs and Redhawk renovated the first floor. The design incorporated the bold and historic building features showcasing the exposed brick walls and steel structural columns.