Captura Software

PROJECT High technology office tenant improvement project from an unimproved shell. The project required demountable partitions throughout the space and specialized climate control requirements in the server room. RESULT Construction team coordinated network system wiring throughout the entire building. Construction and management services performed by Redhawk team members while collaborating with an outside contractor TESTIMONIALS … Read more

NetMotion Wireless

Seattle, WA PROJECT NetMotion Wireless presented a complete build-out from an unimproved building shell. The interior build-out included a server/IT rooms, with a special climate control system, as the temperature cannot vary more than a few degrees at one time. RESULT Redhawk improvements provided a benefit shared by the entire building; the network system and … Read more

Juanita Club

PROJECT Redhawk helped lead an extensive renovation of the existing athletic club, upgrading all finishes throughout the facility, adding acoustical wall panels, new athletic floors, enhanced lighting, seismic upgrades and improvements to the main Men’s and Women’s locker rooms. RESULT Construction was completed on day and night shifts as necessary to keep the facility open … Read more

Edible Arrangements

PROJECT Tenant improvement project in Seattle’s historic Securities Building. Built in 1913, new construction in an old space made for difficult conditions including the framing of the deck and the pouring of the gypcrete floor. Redhawk carefully coordinated the delivery and install of the Owner mandated millwork and equipment. RESULT Tenant moved in on time … Read more

Belcarra Yuan Spa

Bellevue, WA PROJECT Complete tenant build-out of an existing empty structure located in a luxury, mixed-use facility in downtown Bellevue. While the project began with limited documentation and design information, the Redhawk team was instrumental in controlling the design process to ensure budget and schedule compliance throughout. RESULT Following comprehensive project planning on part of … Read more

Sagemark

Kirkland, WA PROJECT The Sagemark project was a two phased, occupied office remodel. Redhawk worked closely with the interior space enclosure contractor and overcame schedule issues caused by the 3rd floor location and limited access constraints. RESULT Ultimately, the Redhawk team was able to overcome project constraints and produce a result that pleased both contractors … Read more

Guitar Center

PROJECT Remodel of existing busy retail space. RESULT Kept the store open and fully functional during construction. TESTIMONIALS “Redhawk has the ability to think outside of the box and create solutions to complex problems.” “They helped us work through some design discrepancies that were cost effective and didn’t slow our schedule.” “They are committed to … Read more

Sherwin Williams Retail

Kent, WA PROJECT Tenant improvement of previous Sherwin Williams space. TESTIMONIALS “Redhawk has the ability to think outside of the box and create solutions to complex problems.” “They helped us work through some design discrepancies that were cost effective and didn’t slow our schedule.” “They are committed to your end goal and will do what … Read more

King County Public Health

Kent, WA PROJECT The King County Public Health Center was a fun and rewarding project for Redhawk. Buffalo Design created an open, vibrant, welcoming space to serve the public’s health needs. The structure consisted of a lobby and reception/check-in, a training room which could be split into two rooms, two separate medical examination halls, office … Read more

PayScale, Inc.

Seattle, WA BACKGROUNDCompleted PROJECTThis was a phased project. The employees occupied the first floor while floors 2 through 5 were under construction, then the employees moved upstairs and Redhawk renovated the first floor. The design incorporated the bold and historic building features showcasing the exposed brick walls and steel structural columns. TESTIMONIALS “Redhawk has the … Read more