South Hill Plaza

Puyallup, WA PROJECT South Hill Plaza houses well-known retailers such as Best Buy, Bed Bath & Beyond and Ross Dress for Less. This 180,000 SF building footprint was constructed during a difficult winter season, with the team implementing several time- and cost-saving measurements to meet the schedule and budget, and to offset the effects of … Read more

Cooper Point

Olympia, WA PROJECT Cooper Point Village is located in beautiful West Olympia, on a 5.8 acre development that included six retail/business buildings with over 54,000 SF of building floor space. The property sat adjacent to wetlands which created an environmentally sensitive site, and the evolving design and long winter months added challenges to the schedule … Read more

Captura Software

PROJECT High technology office tenant improvement project from an unimproved shell. The project required demountable partitions throughout the space and specialized climate control requirements in the server room. RESULT Construction team coordinated network system wiring throughout the entire building. Construction and management services performed by Redhawk team members while collaborating with an outside contractor TESTIMONIALS … Read more

Interurban

Tukwila, WA PROJECT The quick truck-stop strip center was built in an area with heavy truck traffic, requiring substantial coordination between subcontractors and vendors for deliveries and site access. Center was designed for total retail flexibility and anticipated tenant mix changes. RESULT Redhawk worked within the bounds of the Interurban project, coordinating with multiple teams … Read more

Duvall Commons

Duvall, WA PROJECT Duvall Commons is a commercial lot comprised of three retail buildings housing nine different tenants such as Jiffy Lube, Papa Murphy’s Pizza, Shake-n-Go and Starbucks. The project included a restructuring of the existing topography to accommodate the new storm-water collection system. This system was designed to receive runoff from roof, pavement, and … Read more

164th St Crossing

Lynnwood, WA PROJECT The highly visible and populated project site required extensive coordination with existing retail neighbors so as not to impact business operations. Project featured interior build-outs for both Starbucks and Quiznos, and required tight coordination with Alderwood Water District on the busy 164th running in both directions for traffic. RESULT Ultimately, the Redhawk … Read more

Sydney Plaza

Mill Creek, WA PROJECT This former athletic club was converted to 22,000 SF of office space. The Sydney Plaza project included extensive upgrades to the electrical, plumbing and mechanical systems to accommodate the interior office conversions. The existing shell had tilt-up concrete that was converted to office space with full windows requiring seismic upgrades. The … Read more

Rose Hill Plaza

PROJECT The Rose Hill Plaza project was a redevelopment of a former gas station site, and ran simultaneously alongside the Gateway project. This building was specifically designed for a bank, with specialized communications and security requirements. The Class A facility was constructed of conventional steel structure and framing. RESULT In this project, the Redhawk team … Read more

NetMotion Wireless

Seattle, WA PROJECT NetMotion Wireless presented a complete build-out from an unimproved building shell. The interior build-out included a server/IT rooms, with a special climate control system, as the temperature cannot vary more than a few degrees at one time. RESULT Redhawk improvements provided a benefit shared by the entire building; the network system and … Read more