Sagemark

Kirkland, WA PROJECT The Sagemark project was a two phased, occupied office remodel. Redhawk worked closely with the interior space enclosure contractor and overcame schedule issues caused by the 3rd floor location and limited access constraints. RESULT Ultimately, the Redhawk team was able to overcome project constraints and produce a result that pleased both contractors … Read more

Guitar Center

PROJECT Remodel of existing busy retail space. RESULT Kept the store open and fully functional during construction. TESTIMONIALS “Redhawk has the ability to think outside of the box and create solutions to complex problems.” “They helped us work through some design discrepancies that were cost effective and didn’t slow our schedule.” “They are committed to … Read more

The Clark

PROJECT This multi-story mixed-use facility sits across from Greenlake. It houses 24 apartment units with office space below; currently the home of Redhawk Group’s office. RESULT The project was originally designed to be condos, but were built as fee rental units with mid to high range finishes throughout the complex. There are two underground parking … Read more

Juanita Bay Pool

PROJECT Extensive expansion of pool area at Columbia Athletic Club, Juanita Bay creating a cutting edge aquatic center including a 25 yard lap pool and 17 yard family/teaching pool. The renovation also included a new hot tub, family changing rooms and a unique, open design with high ceilings and windows that added a lot of … Read more

The Westside

PROJECT This 47 unit commercial/residential unit building is located one block off Seattle’s historic Broadway Avenue. Redhawk worked through preconstruction closely with the Owner/Architect to value engineer 20% from the budget and design for a viable and successful project. RESULT Expected completion Spring 2014 TESTIMONIALS “Redhawk has the ability to think outside of the box … Read more

306 Queen Anne

PROJECT This project has three live-work units on the ground level and 50 apartment units. It consists of concrete foundation and PT deck and six wood framed floors. This project is located on a busy Queen Anne street near the Space Needle and Seattle Science Center. RESULT Project completion early Summer 2014 TESTIMONIALS “Redhawk has … Read more

1711 12th Ave

PROJECT This project had poor site soils from the beginning. The building is supported by 187 pipe piles with continuous grade beams. It consists of 34 apartment units and three live-work units on the ground level. RESULT Project completion Winter 2013 TESTIMONIALS “Redhawk has the ability to think outside of the box and create solutions … Read more

509 1st Ave

PROJECT 43 Unit apartment building with one level of underground parking. The project started during one of the wettest fall seasons on record in the Seattle area. The excavation created a large ‘tub’ for rain water to collect and had to be pumped from the site through a storm water management system for 2 weeks. … Read more

AVIA Napa, a Hyatt Hotel

Napa Valley, CA PROJECT Four star boutique hotel in the hart of Napa Valley, California. The hotel was designed with a luxurious and upscale layout including a $4 Million budget for interior finishes alone. All of the marble installed on the project was procured from China. The hotel has 169 total units, including six high … Read more

North Bend Bartell Drugs

North Bend, WA PROJECT Redhawk constructed the newest location for the Bartell family in the heart of downtown North Bend. The retail shop, sits in the shadow of the beautiful Mount Si mountain. Due to poor site soils, the 15,683 sf building sits on top of 295 pin piles, 6″ wide and roughly 40′ deep. … Read more